Boundary setting out
Agree the working line, overall length, heights and authorised access before post locations are finalised.
✦ FENCING · LONDON & NEARBY
A new fence needs a defined boundary, a preferred finish and a clear access route. Show the full line rather than one panel alone.
Trading since March 2015 · Edgware based · Homes & businesses

Start by identifying the boundary and who can approve work. A fence cannot resolve disputed ownership or justify entering a neighbouring property without permission. Measure the run and show corners, gates and changes of ground level. Wooden fencing is included in this installation brief rather than a separate duplicate service. Consider the appearance from both sides, mature planting nearby and how the boundary will be maintained after installation.
The proposed scope should identify removal where needed, post positions, supporting foundations and the selected panels or boards. Ground condition and hidden obstructions can affect preparation. Heights and stepped sections must relate to the actual site rather than a standard photograph. Confirm any permissions or restrictions before ordering materials. No confirmed security rating or product lifespan is claimed.
Agree the working line, overall length, heights and authorised access before post locations are finalised.
Specify the post material and support arrangement, taking account of ground condition and adjoining features.
Approve the selected timber panels, boards, gates or edging and state what finishing treatment is included.
For fence installation, send the postcode, approximate run length and photos from both ends. Include the current boundary, garden access and loading position. Say whether you need timber panels, boards, a gate or removal. The quotation distinguishes material supply, supporting work and any separately agreed collection.
Tree removal, substantial retaining work, boundary disputes and electrical gate systems are separate assessments. Waste collection remains subject to confirmed registration and appropriate arrangements; it is not an automatic installation extra.
✦ BEFORE YOU BOOK
Yes, timber panels or boards can be specified here. Product, height and supporting details must be agreed before installation.
Identify ownership and obtain the required permission. Access and the approved line must be established before work starts.
Only if specified. Give the opening size and intended use so gates, posts and fittings can be assessed.
Discuss stepped or other suitable arrangements using site photos and measurements. The supporting design depends on the actual levels.
Removal can be scoped separately. Identify the material, condition and agreed disposal arrangement before assuming it is included.
✦ RELATED TASKS
Your postcode and current photos help define the scope before we agree a quotation and appointment.