Design the connection between two levels
Photograph the top and bottom of the route before concentrating on the steps. The approach might start at a doorway and finish where a path turns. Show both areas, including any place where someone needs to pause or change direction. Tell us who uses the route and whether the existing arrangement feels awkward.
What the step work covers
We assess the ground, surrounding levels and agreed materials, including porcelain where suitable for the project. Discuss edges, lighting and how the route would meet adjacent surfaces. Work to the patio, retained ground or path outside the proposed steps is included where specified after assessment.
Three steps for your enquiry
- Show both ends of the proposed route
- Review the change in level and adjoining surfaces
- Agree materials, connections and the written scope
Check the route before choosing a finish
Photograph the route in the direction you usually walk. Show any corner or doorway close to the proposed steps and describe how you want to use the area in low light. If the steps are part of a wider raised structure or alterations to a listed property, ask the council about your proposal using the GOV.UK planning permission guidance.



